You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Investigation of using the next rate (or price) for fee reclamation, rather than waiting a fixed period of time. This is very appealing on L2 as timestamps lack granularity (15mins by default, with an aim to get towards 5mins in the near future via the Optimism team)
Tasks
get rough estimate of how long rates can go without an update on L2. This depends on the heartbeats and deviations on L2.
determine, based on the above, if more scoping is continuing
The text was updated successfully, but these errors were encountered:
gberg1
changed the title
Sip 52 - Next Price Fee Reclamation
Research how SIP-52 next price fee reclamation effectiveness on L2
Mar 25, 2021
gberg1
changed the title
Research how SIP-52 next price fee reclamation effectiveness on L2
Research SIP-52 next price fee reclamation effectiveness on L2
Mar 25, 2021
Summary
Investigation of using the next rate (or price) for fee reclamation, rather than waiting a fixed period of time. This is very appealing on L2 as timestamps lack granularity (15mins by default, with an aim to get towards 5mins in the near future via the Optimism team)
Tasks
The text was updated successfully, but these errors were encountered: