You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
{{ message }}
This repository was archived by the owner on Jan 26, 2021. It is now read-only.
When a volunteer/admin logs in hours and views a report -
The logged start and end time show the shift start and end hours. This shift is the one for which the hours have been logged
The calculation of total hours is also based on this and total logged hours for 2 shifts are same as the sum of the two shift hours. So irrespective of the fact that two volunteers have logged different hours, the report will show the same number of hours for both.
The text was updated successfully, but these errors were encountered:
When a volunteer/admin logs in hours and views a report -
The text was updated successfully, but these errors were encountered: