Releases: joniles/mpxj
Releases · joniles/mpxj
Version 7.9.2
- Add support for reading and writing secondary constraints from P6 schedules (Based on a contribution by Sruthi-Ganesh)
- Improve support for Synchro SP files containing blank tasks.
- Make constraint type mapping consistent when reading and writing PMXML files.
- Improve handling of leveling delay units and actual duration units (Based in a contribution by Daniel Schmidt).
- Improve handling of certain types of malformed MPP files.
- Improve handling of certain types of malformed SDEF files.
- Map P6 Equipment resource type to cost rather than work (Contributed by forenpm)
- Improve handling of certain MPP files containing large numbers of blank tasks.
- Improve handling of certain MPX files containing trailing delimiters.
Version 7.9.1
- Set task start, finish and percent complete when reading SDEF files.
Version 7.9.0
- Add support for reading SDEF files.
Version 7.8.4
- Add support for reading data links (linked fields) configuration from MPP files.
- Updated to avoid an infinite loop when processing certain corrupt files (Contributed by ninthwaveltd).
- Update MSPDI generation to ensure MS Project correctly recognises complete tasks without resource assignments.
- Ensure that activity codes are read for P6 schedules.
- Improve support for reading custom field values derived from custom field lookup tables in MPP files.
- Improve support for MPP files written with the June 2019 update of Microsoft Project.
Version 7.8.3
- Improve handling of task baseline start, start, baseline finish, finish and slack fields read from FTS files.
Version 7.8.1
- Improve support for reading the Synchro Scheduler 2018 SP files.
- Add support for reading Gantt Designer GNT files.
- Improve handling of non-standard MSPDI files.
- Improve handling of non-standard GanttProject files.
- Update MSPDI generation to ensure MS Project correctly recognises complete milestones without resource assignments.
- Improve support for reading user defined fields from PMXML files.
- Ignore hammock tasks when reading PP files.
Version 7.8.1
- Improve support for reading the Synchro Scheduler 2018 SP files.
- Add support for reading Gantt Designer GNT files.
- Improve handling of non-standard MSPDI files.
- Improve handling of non-standard GanttProject files.
- Update MSPDI generation to ensure MS Project correctly recognises complete milestones without resource assignments.
- Improve support for reading user defined fields from PMXML files.
- Ignore hammock tasks when reading PP files.
Version 7.8.0
- Added support for reading and writing GUIDs for Tasks, Resources, and Assignments in MSPDI files.
- Updated Java build to use Maven
- Updated to provide a general performance improvement (Based on a contribution by Tiago de Mello)
- Updated to fix an issue when the Microsoft JDBC driver is used to access a P6 database in SQL Server 2005
- Fixed Issue 332: Asta lag #correct (Based on a contribution by Dave McKay)
- Fixed Issue 333: Asta constraints lost (Contributed by Dave McKay)
- Fixed Issue 335: MSDPI into Asta doesn't import Calendar exceptions (Contributed by Dave McKay)
Version 7.7.1
- Read additional schedule options from XER files. (Contributed by forenpm)
- Improve handling of some types of MPP file with missing resource assignment data.
- Ensure that resource assignment flag fields are read correctly for all MPP file types (Based on a contribution by Vadim Gerya).
- Ensure that timephased actual work is handled correctly for material resources (Contributed by Vadim Gerya).
- Improve accuracy when reading resource type from MPP files.
- Improve compatibility of generated MSPDI files with Asta Powerproject (Contributed by Dave McKay).
Version 7.7.0
- Add support for reading the Synchro Scheduler SP files.
- Add support for reading the activity code (ID) from Asta files.
- When reading a Phoenix file, set the project's status date to the data date from the storepoint.
- Handle MSPDI files with timephased assignments that don't specify a start and end date.