Skip to content

The big one? (take 2) #127

The big one? (take 2)

The big one? (take 2) #127

Triggered via push June 2, 2024 16:06
Status Failure
Total duration 6h 0m 29s
Artifacts 6

release.yml

on: push
Matrix: build
release
0s
release
Fit to window
Zoom out
Zoom in

Annotations

4 errors
build (arm64v8/fedora:38, fedora-aarch64)
The job running on runner GitHub Actions 15 has exceeded the maximum execution time of 360 minutes.
build (arm64v8/fedora:38, fedora-aarch64)
The operation was canceled.
build (lopsided/archlinux-arm64v8:devel, arch-aarch64)
The job running on runner GitHub Actions 11 has exceeded the maximum execution time of 360 minutes.
build (lopsided/archlinux-arm64v8:devel, arch-aarch64)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
DT-arch Expired
25.5 MB
DT-fedora Expired
24.4 MB
DT-ubuntu20.04 Expired
24.1 MB
DT-ubuntu20.04-aarch64 Expired
22 MB
DT-ubuntu22.04 Expired
25 MB
DT-ubuntu22.04-aarch64 Expired
24.2 MB