Skip to content

CI pipeline #229

CI pipeline

CI pipeline #229

Re-run triggered February 29, 2024 12:25
Status Failure
Total duration 2m 5s
Artifacts 1

build-pipeline.yml

on: workflow_dispatch
Matrix: live-integration-tests
Matrix: pytest-coverage
smoke-tests
15s
smoke-tests
codecov-upload
0s
codecov-upload
Fit to window
Zoom out
Zoom in

Annotations

15 errors
smoke-tests
Process completed with exit code 2.
live-integration-tests (3.11)
Process completed with exit code 2.
live-integration-tests (3.10)
Process completed with exit code 2.
live-integration-tests (3.9)
The job was canceled because "_3_11" failed.
live-integration-tests (3.9)
Process completed with exit code 2.
live-integration-tests (3.12)
The job was canceled because "_3_11" failed.
live-integration-tests (3.12)
Process completed with exit code 2.
live-integration-tests (3.8)
The job was canceled because "_3_11" failed.
live-integration-tests (3.8)
The operation was canceled.
pytest-coverage (3.9)
Process completed with exit code 3.
pytest-coverage (3.12)
The job was canceled because "_3_9" failed.
pytest-coverage (3.12)
Process completed with exit code 3.
pytest-coverage (3.8)
The job was canceled because "_3_9" failed.
pytest-coverage (3.11)
The job was canceled because "_3_9" failed.
pytest-coverage (3.10)
The job was canceled because "_3_9" failed.

Artifacts

Produced during runtime
Name Size
pyhanko-dist Expired
802 KB