Notifications
You must be signed in to change notification settings - Fork 66
Issues: architecture-building-systems/CityEnergyAnalyst
New issue
Have a question about this project? # for a free GitHub account to open an issue and contact its maintainers and the community.
By clicking “#”, you agree to our terms of service and privacy statement. We’ll occasionally send you account related emails.
Already on GitHub? # to your account
Author
Label
Projects
Milestones
Assignee
Sort
Issues list
Refactor and organize the config file for improved usability
about-interface
is-bug
priority-must-have
These requirements are critical and must be included in CEA
Convert building properties files from .dbf to .csv
about-use-case
priority-must-have
These requirements are critical and must be included in CEA
Remove geometry simplification in radiation
feature-radiation
priority-must-have
These requirements are critical and must be included in CEA
Debug - maintenance
Epic
is-bug
priority-must-have
These requirements are critical and must be included in CEA
Debug & New - visualisation
Epic
feature-visualisation
anything related visualising CEA results
priority-must-have
These requirements are critical and must be included in CEA
Debug - solar energy yields
Epic
feature-renewable
priority-must-have
These requirements are critical and must be included in CEA
Debug - energy demand
Epic
feature-demand
priority-must-have
These requirements are critical and must be included in CEA
Standardise names, headings, config descriptions and all
about-documentation
about-interface
priority-must-have
These requirements are critical and must be included in CEA
Visualising thermal network design on the main viewport
about-interface
feature-visualisation
anything related visualising CEA results
priority-must-have
These requirements are critical and must be included in CEA
Error messages & hints
about-interface
Epic
priority-must-have
These requirements are critical and must be included in CEA
CEA, photovoltaic gets stuck on panel tilt angle
feature-renewable
is-bug
priority-must-have
These requirements are critical and must be included in CEA
Exclude buildings from the network before running optimization (Constraint)
feature-network
priority-must-have
These requirements are critical and must be included in CEA
Print out COP in the results (heating activation curve) of the decentralized optimization tool
#3661
opened Sep 27, 2024 by
jimenofonseca
Summary File for the decentralized optimization
feature-optimisation
priority-should-have
These requirements are important but not crucial for CEA
#3660
opened Sep 27, 2024 by
jimenofonseca
CEA installation with .exe reported error and failed
is-bug
priority-must-have
These requirements are critical and must be included in CEA
Unable to plot optimization results
feature-optimisation
feature-visualisation
anything related visualising CEA results
priority-must-have
These requirements are critical and must be included in CEA