Skip to content

build(deps): bump go.opentelemetry.io/contrib from 1.20.0 to 1.30.0 in /otelfiber #1136

build(deps): bump go.opentelemetry.io/contrib from 1.20.0 to 1.30.0 in /otelfiber

build(deps): bump go.opentelemetry.io/contrib from 1.20.0 to 1.30.0 in /otelfiber #1136

Triggered via pull request September 12, 2024 21:43
Status Failure
Total duration 1m 41s
Artifacts

govulncheck.yml

on: pull_request
set-matrix
4s
set-matrix
Matrix: govulncheck-check
Fit to window
Zoom out
Zoom in

Annotations

6 errors
govulncheck-check (otelfiber)
Process completed with exit code 1.
govulncheck-check (opafiber)
The job was canceled because "otelfiber" failed.
govulncheck-check (websocket)
The job was canceled because "otelfiber" failed.
govulncheck-check (paseto)
The job was canceled because "otelfiber" failed.
govulncheck-check (socketio)
The job was canceled because "otelfiber" failed.
govulncheck-check (socketio)
The operation was canceled.