In order to provide a way for CI to ensure that the current state of a repository is valid and all necessary commits that produce generated changes have been run by developers, make validate
runs a series of checks on a clean Git repository.
Specifically, the workflow used by make validate
does the following:
- Ensure Git is clean; if not, fail.
- Run
make charts
; if Git is no longer clean, fail and leave behind the assets. -
Only if
validate.url
andvalidate.branch
are provided in theconfiguration.yaml
, pull in the specified Git repository, standardize the repository, and check each asset:- For any assets that exist in upstream, check if it is modified or does not exist in local. If so, copy it over, unzip it, and fail.
- For any assets that exist in local but not in upstream, check if it corresponds to an entry in the
release.yaml
; if not, fail.
- Run
make unzip
; if Git is no longer clean, fail.
The release.yaml
is only specified if validate.url
and validate.branch
are provided in the repository's configuration.yaml
. It is created automatically if you run make validate
, which will produce a list of assets that have been modified based on your upstream repository.
When a GitHub repository is provided for this repository to validate against, the scripts ensure that any changes introduced to the current repository make no additions, modifications, or deletions to the upstream repository's charts/
, assets/
, or index.yaml
.
However, if this were the case always, we would not be able to add charts or make modifications to existing charts!
Therefore, to signal to the scripts that you are adding a new chart to upstream, making a modification to an existing chart, or removing a chart, you will need to specify the versions under ${CHART}
.
For example:
<chart>:
- <version>
- <version>
- <version>
- ...
rancher-monitoring:
- 100.0.0+up16.6.0
rancher-monitoring-crd:
- 100.0.0+up16.6.0
fleet:
- 100.0.0+up0.3.6
fleet-agent:
- 100.0.0+up0.3.6
fleet-crd:
- 100.0.0+up0.3.6
longhorn:
- 100.0.0+up1.1.2
- 100.0.0+up1.2.0
longhorn-crd:
- 100.0.0+up1.1.2
- 100.0.0+up1.2.0
One of the caveats with using the release.yaml
is that renames are not supported (e.g. you cannot remove and replace a chart in a single step).
As a result, if you attempt to modify a version of a chart that already exists in upstream, both the old version and the new version must exist in the release.yaml for CI to pass. Once the changes have been merged, you can later remove the old version from the release.yaml (usually as part of a release process).
To give a concrete example of such a scenario, let's say that you have currently committed my-chart
version 0.1.2-rc3
. You then take the following steps:
- You modify the
package.yaml
to point at a new upstream URL that points to0.1.2-rc4
and resolve any conflicts with the patch files underpackages/my-chart-package/generated-changes
- You run
CHART=my-chart VERSION=0.1.2-rc3 make remove
to delete the older version of the chart - You run
make charts
to produce the new assets and charts formy-chart
version0.1.2-rc4
. - You modify the release.yaml to replace
my-chart[0] = 0.1.2-rc3
withmy-chart[0] = 0.1.2-rc4
. - You make a PR to your repository.
In this case, CI will fail since you are attempting to remove 0.1.2-rc3
but it is not tracked in the release.yaml
.
Therefore, the correct resolution would be to leave your release.yaml
as:
...
my-chart:
- 0.1.2-rc3
- 0.1.2-rc4
...
That way, both the removal of 0.1.2-rc3
and the addition of 0.1.2-rc4
are accepted. Later, you can remove 0.1.2-rc3
once the PR has been committed.