Skip to content

Integration tests #26

Integration tests

Integration tests #26

Triggered via schedule October 15, 2024 01:20
Status Failure
Total duration 1m 30s
Artifacts
Matrix: setup-environment
Matrix: Run Integration Tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors
Run Integration Tests (3.10)
Process completed with exit code 2.
Run Integration Tests (3.11)
The job was canceled because "_3_10" failed.
Run Integration Tests (3.11)
Process completed with exit code 2.
Run Integration Tests (3.12)
The job was canceled because "_3_10" failed.
Run Integration Tests (3.12)
The operation was canceled.