ci: switch Google workload identity provider #218
ci.yml
on: pull_request
Matrix: integration_test_matrix
Matrix: tidy_and_test_matrix
all_ci_tests
11s
Annotations
9 errors
integration_test_matrix (windows-2025)
Canceling since a higher priority waiting request for 'Continuous Integration-30' exists
|
integration_test_matrix (windows-2025)
The operation was canceled.
|
integration_test_matrix (macos-15)
Canceling since a higher priority waiting request for 'Continuous Integration-30' exists
|
integration_test_matrix (macos-15)
The operation was canceled.
|
integration_test_matrix (ubuntu-22.04)
Canceling since a higher priority waiting request for 'Continuous Integration-30' exists
|
integration_test_matrix (ubuntu-22.04)
The operation was canceled.
|
integration_test_matrix (macos-13)
Canceling since a higher priority waiting request for 'Continuous Integration-30' exists
|
integration_test_matrix (macos-13)
The operation was canceled.
|
all_ci_tests
Process completed with exit code 1.
|