Going to switch to regular logging rather than new files between each break. also logging other things instead of just progression related to keep an overall track of productivity
powerbi work 2h
updated budget 30m
640pm powerbi 10m
730pm powerbi/casestudies 2h
1050pm case study 1 wind up
140pm 1h case study
730pm 1h50m case study
4pm 30m interview
430pm case study responses prep + linkedin 1h10m