Skip to content
Andreas Ziegler edited this page Aug 25, 2022 · 5 revisions

09.08.2022 - 20:00 CEST - mumble.freifunk.net

Notes from last Meetup: Meeting 2022-03

Attendees

  • [👤 aiyion] (ffh)
  • [👤 blocktrron] (ffda)
  • [👤 lemoer] (ffh)
  • [👤 mkg20001] (ffgraz)
  • [👤 tomh] (ffda)

Topics

  • Release v2022.1
  • 32 Client Limit bei ath10k-ct Wechsel zu ath10k-ct in #2541 ath10k_ahb a000000.wifi: htt-ver 2.2 wmi-op 6 htt-op 4 cal pre-cal-file max-sta 32 raw 0 hwcrypto 1
  • open PRs

Discussion about the v2022.1

  • Timeline: Release within two weeks (19.08.2022).
    • Afterwards: ~ 6 weeks later, release v2022.1.1
  • Discussion about the PRs that are already in the v2022.1 milestone:
  • Discussion about potential new PRs to this milestone:
    • https://github.com/freifunk-gluon/gluon/pull/2601
      • It would be nice, if this is merged before the release, since then it would be included in the first wireguard release of gluon.
        • The key translation is most effective, if no wireguard-keys have been generated yet.
      • Consenus:
        • Neoraider should review this PR, since he has the most insight into fastds crypto.
      • Blocktrron would not like to delay the milestone for this PR.
      • We would like to try to merge this before 19.08.2022 (if possible).
        • If not, we will add a note to release note, that this package is about to come.
    • https://github.com/freifunk-gluon/gluon/pull/2599
      • Should be sane, only needs testing.
  • Release-Notes:
  • Is there anything open from the ar71-xx -> ath79 migration?
    • No, everything important has been done.

32 Client Limit bei ath10k-ct

Open PRs

Fundings

Clone this wiki locally